Reconstruction and renovation of a workshop building with 53 studios in Berlin-Adlershof.
As part of building maintenance overlapping sub-measures (repair / renovation / remodeling / renovation) were controlled in the following areas:
Ventilation system EC / 2nd floor, remodeling and renovation 1st floor.