The interchange Bismarkstraße U7 (U2) was opened for the first time in the year 1978th As part of a basic rehabilitation program of BVG the lower platform plateau was equipped with a tactile blind control system. Complete flooring work (asphalt residue free removal) and gradual renewal of the entire coating were implemented under full operation. The work took place in the summer of 2009 until early 2010.